Central · Act 36 of 2003

Section 32 — Functions of State Load Despatch Centres.

The Electricity Act, 2003

↓ PDF / PrintOfficial source ↗
STATUTORY TEXT
Find in this text
(1) The State Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in a State.

(2) The State Load Despatch Centre shall--

(a) be responsible for optimum scheduling and despatch of electricity within a State, in accordance with the contracts entered into with the licensees or the generating companies operating in that State;

(b) monitor grid operations;

(c) keep accounts of the quantity of electricity transmitted through the State grid;

(d) exercise supervision and control over the intra-State transmission system; and

(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code.

(3) The State Load Despatch Centre may levy and collect such fee and charges from the generating companies and licensees engaged in intra-State transmission of electricity as may be specified by the State Commission.

Source and version

India Code, Government of India. Text fetched 10 Oct 2026. Check the linked official text and subsequent notifications when applying a provision.

Share this section

Section 32 — Functions of State Load Despatch Centres. | The Electricity Act, 2003 | NYAYA SIGNALNYAYA SIGNAL · Free access · Official source references

· Saves and reading positions stay on this device.