(a) inform the prescribed authority by at least 15 days prior notice in writing about his intension to do so ;
(b) erect a signboard on commencement of work near the well site indicating complete address of the user agency or the owner of the well and the drilling agency employed to sink the well ;
(c) erect barbed wire fencing or any other suitable barrier around the well during execution of work ;
(d) construct a concrete platform measuring 0.5 x 0.5 x 0.6 metre (0.3 metre below ground level and 0.3 metre above ground level) around the well casing ;
(e) cap the well assembly by welding steel plates or with nuts and bolts.
(2) On completion of work, such person or agency shall fill up the mud pits or channels and restore the ground condition to the position as existed before commencement of drilling operations or sinking of the well.
(3) If any user agency or owner of a well abandons such well, he shall fill up the abandoned well with clay, sand, boulders, pebbles or such other material from the bottom of such well to the ground level and obtain a certificate from the Executive Engineer concerned that such abandoned well has been properly filled up and capped.
आगे पढ़ें / Continue reading
Explore the next section or browse this act in the selected language.
More sections of this act
Section 1 · Short title and commencement.Section 2 · Definitions.Section 3 · Property of the Government.Section 4 · State Water Policy and Plan.Section 5 · Supply of drinking water.Section 6 · Supply of water for domestic purposes.Section 7 · Supply of water for purposes other than domestic purposes.Section 8 · Application for supply of water.India Code, Government of India. Text fetched 16 Oct 2026. Check the linked official text and subsequent notifications when applying a provision.