Jharkhand · Act 36 of 2003

Section 28 — Functions of Regional Load Despatch Centre.

Electricity Act, 2003

Read in your languageअपनी भाषा में पढ़ें · Official source versions

Mapped language choices keep this section. Other choices are labelled ‘Complete act’ until section mappings are verified.

Only available official source versions are shown. Language labels come from source metadata or filenames.

STATUTORY TEXT
Find in this text
28. Functions of Regional Load Despatch Centre.–(1) The Regional Load Despatch Centre shall be 
the apex body to ensure integrated operation of the power system in the concerned region. 

(2) The Regional Load Despatch Centre shall comply with such principles, guidelines and 
methodologies in respect of wheeling and optimum scheduling and despatch of electricity as the Central 
Commission may specify in the Grid Code. 

(3) The Regional Load Despatch Centre shall– 
(a) be responsible for optimum scheduling and despatch of electricity within the region, in 

accordance with the contracts entered into with the licensees or the generating companies operating in 
the region; 

(b) monitor grid operations; 
(c) keep accounts of quantity of electricity transmitted through the regional grid; 
(d) exercise supervision and control over the inter-State transmission system; and 



24 
 

(e) be responsible for carrying out real time operations for grid control and despatch of electricity 
within the region through secure and economic operation of the regional grid in accordance with the 
Grid Standards and the Grid Code. 

(4) The Regional Load Despatch Centre may levy and collect such fee and charges from the 
generating companies or licensees engaged in inter-State transmission of electricity as may be specified 
by the Central Commission.

Source footnotes

Document extract. Section boundaries were matched to the arrangement of sections in the official source. Original formatting and footnote placement can differ; check the linked document.

आगे पढ़ें / Continue reading

Explore the next section or browse this act in the selected language.

Next · Section 29Compliance of directions. →All sections / सभी धाराएँElectricity Act, 2003 →
More sections of this actSection 1 · Short title, extent and commencement.Section 2 · Definitions.Section 3 · National Electricity Policy and Plan.Section 4 · National policy on stand alone systems for rural areas and non-conventional energy systems.Section 5 · National policy on electrification and local distribution in rural areas.Section 6 · Joint responsibility of State Government and Central Government in rural electrification.Section 7 · Generating company and requirement for setting up of generating station.Section 8 · Hydro-electric generation.
Source and version

India Code, Government of India. Text fetched 10 Oct 2026. Check the linked official text and subsequent notifications when applying a provision.

Share this section

Section 28 — Functions of Regional Load Despatch Centre. | Electricity Act, 2003 | NYAYA SIGNAL

Share the card with this clickable reading link. पढ़ें और अगली धारा देखें।

NYAYA SIGNAL · Free access · Official source references

· Saves and reading positions stay on this device.