33. Compliance of directions.–(1) The State Load Despatch Centre in a State may give such directions and exercise such supervision and control as may be required for ensuring the integrated grid operations and for achieving the maximum economy and efficiency in the operation of power system in that State. (2) Every licensee, generating company, generating station, sub-station and any other person connected with the operation of the power system shall comply with the directions issued by the State Load Depatch Centre under sub-section (1). (3) The State Load Despatch Centre shall comply with the directions of the Regional Load Despatch Centre. (4) If any dispute arises with reference to the quality of electricity or safe, secure and integrated operation of the State grid or in relation to any direction given under sub-section (1), it shall be referred to the State Commission for decision: Provided that pending the decision of the State Commission, the directions of the State Load Despatch Centre shall be complied with by the licensee or generating company. (5) If any licensee, generating company or any other person fails to comply with the directions issued under sub-section (1), he shall be liable to a penalty not exceeding rupees five lacs. Other provisions relating to transmission
Source footnotes
Document extract. Section boundaries were matched to the arrangement of sections in the official source. Original formatting and footnote placement can differ; check the linked document.
आगे पढ़ें / Continue reading
Explore the next section or browse this act in the selected language.
More sections of this act
Section 1 · Short title, extent and commencement.Section 2 · Definitions.Section 3 · National Electricity Policy and Plan.Section 4 · National policy on stand alone systems for rural areas and non-conventional energy systems.Section 5 · National policy on electrification and local distribution in rural areas.Section 6 · Joint responsibility of State Government and Central Government in rural electrification.Section 7 · Generating company and requirement for setting up of generating station.Section 8 · Hydro-electric generation.India Code, Government of India. Text fetched 10 Oct 2026. Check the linked official text and subsequent notifications when applying a provision.